Wisconsin Rapids Paper Mill




Wisconsin Rapids Paper Mill



Welcome PhotoShopped ResizedWithArrows.jpg




#16 Paper Machine

(45036)



PM16-01.jpgPM16-02.jpg


  • Built: 1992

Rebuilt: 2004

  • Annual Capacity:  

375,000 tons/a

  • Max Speed:  

4,200 fpm

  • Trim Width:  

240 inches

  • Equipment:

Concept IV – MH Headbox

Top Wire Former

Press; Shoe Press + 4th 

Machine Precoater

Four Station Tandem Coater

2 - 12-Roll Supercalenders

2 - Winders

  • Basis Weights: 

70 lb. - 146 lb./3300 ft² 

  • Products:  

Premium Text and Light Weight Cover Fine Papers 

Light Weight Digital

Graphical Board


#14 Paper Machine

(45037)



PM14-01 Resized.jpgPM14-02.jpg


  • Built: 1922

Rebuilt: 1988

  • Annual Capacity:  

200,000 tons/a

  • Max Speed:  

2500 fpm

  • Trim Width:  

145 inches 

  • Equipment:

Concept III Headbox

Top Wire Former

Four Station Tandem Coater

3 - Supercalenders

2 - Winders

  • Basis Weights: 

146 lb. - 238 lb./3300ft²

  • Products:

Premium Heavy Weight Offset

Digital Products

Graphical Board


Wetlap Machine

(45092)


Wetlap Machine 45092.jpg



Pulp, Power & Recovery



PulpPowerRecovery-P1-01.jpg


PulpPowerRecovery-P2-01.jpgPulpPowerRecovery-P2-02 Resized.jpg
















  • Total Production: 

415,000 ADT/a Hwd

22,000 ADT/a Swd         

  • Pulp Utilization:

Internal Hardwood: 354,000 ADT/a 

Hardwood: Maple, Birch, Oak 

Internal Softwood: 22,000 ADT/a 

Jack, Red and Ponderosa Pine, Tamarack

Stevens Point Hardwood: 61,000 ADT/a

Fiberlines:

#1 - 1968 Kamyr digester (Downflow)

Bleaching, O2D, DEoD 

#2 - 1984 Kamyr digester (Downflow)

Bleaching, O2D, DEopD

  • Recovery Cycle

3 – Recovery Boilers

1 – Lime Kiln

  • Power:

2 – Coal Fired Power Boilers

1 – Natural Gas Power Boiler

3 - Turbines



Mill Recovery and Utility Processes



RecoveryUtility-01 Resized.jpgRecoveryUtility-02 Resized.jpg



  • Recovery

Recovery Boiler 1 (1968) 1.6 MM lbs/day, 200 klbs/hr steam @1275 psi

Recovery Boiler 2 (1976) 1.6 MM lbs/day, 215 klbs/hr steam @1275 psi

Recovery Boiler 3 (1989) 1.4 MM lbs/day, 188 klbs/hr steam @1275 psi


  • Utilities: Boilers

#1 Power Boiler 1968 CE VU – 40 stoker grate design 

Coal and Wood Waste – 250klbs/hr@1275 psi

#2 Power Boiler 1968 CE VU – 40 stoker grate design  

Coal and Wood Waste – 250klbs/hr@1275 psi

#3 Power Boiler 1991 Zurn gas boiler

Natural Gas – 400klbs/hr@1275 psi (original design)

270klbs/hr @1275 psi (current actual)


  • Utilities: Power 

Turbine 1 (1967 G.E.) Extraction – 32 MW

Turbine 2 (1991 G.E.) Extraction – 40 MW

Typically providing from 65% to 75% of mill needs


  • Electrical Energy

70 MW Total Mill Consumption

50 MW Total Internal Generation


  • 75.8% renewable fuel (based on total steam generation)